Home
About
Gallery
Track Plan
Construction
Links
Contact
Looking down over the bridge under construction. The total length of the bridge is almost 19 metres with each span bridging 2.7 metres. The railhead will be around 2.2 metres off the ground at the highest point.
Text and photos Copyright © 2012 Dave Webb. All rights reserved.
Created by deeja Dec 2012