Home
About
Gallery
Track Plan
Construction
Links
Contact
From where the tunnel entrance will be looking back up the 1 in 30 towards the workshop with the track centre line and bridge paint shopped in.
Text and photos Copyright © 2008 Dave Webb. All rights reserved.
Created by deeja Oct 2008