Track54
Looking back towards the workshop with the first tunnel pipe in place. The grade through the tunnel and up to the workshop points is 1 in 40. After passing through the workshop points it then becomes 1 in 30 all the way up to the top loop. The top loop formation and bridge abutments can be seen in the background just above the tractor.

 

Text and photos Copyright © 2008 Dave Webb. All rights reserved.  


Created by deeja Mar 2010