Home
About
Gallery
Track Plan
Construction
Links
Contact
The end of the line for the Malcolm Moore loco until the bridge is completed. The elevation between the top loop and the points leading into the workshop is just on 3 metres.
Text and photos Copyright © 2008 Dave Webb. All rights reserved.
Created by deeja Mar 2010