Approximate position of the tunnel and the track centre line leading out of the tunnel into a passing loop and up the 1 in 30 towards the workshop. |
Another view of the 1 in 30 leading out of the tunnel. |
From where the tunnel entrance will be looking back up the 1 in 30 towards the workshop with the track centre line and bridge paint shopped in. |
The 1 in 30 again but with the bridge reversing loop paint shopped in the background. |
Looking down the embankment behind the workshop at the approximate the location of the points leading into the top reversing loop. |
Taken standing just before the bridge leading into the top reversing loop. |
From the top loop siding, the highest point on the railway, looking back towards the workshop behind the bridge. |
Building up the embankment around the back of the workshop. |
Looking down the embankment around the back of the workshop. |
Starting to level out for the top loop siding and station area. |
Grading the bank for a good finish. |
The top loop station area almost complete. |
Building up the embankment around the workshop. |
Moving earth from the top reversing loop to form the embankment. |
The completed 1 in 30 grade formation running around the workshop up towards the top reversing loop. |
Positioning a boulder for one of the bridge abutments. |
The completed track formation either side of the bridge using boulders for the bridge abutments. |
Another view showing the bridge abutments and the 1 in 30 formation in the background. |
Looking across the gap where the bridge will be situated. |
The newly formed "Boulder Creek" shown as it is about to pass between the bridge abutments. |
Top reversing loop with the 1 in 30 in the foreground leading up towards the workshop to the right. |
Looking at the top reversing loop formation from the top of the 1 in 30. |
The track work begins. |
Track is laid in position before the second rail is welded in place. |
|